Questionnaire of the participant of the preliminary selection of air hoists for Arctic LNG 2 plant in Russia

Keyword:air hoists   Time:2023-2-23 10:10:03


Name:

 

Questionnaire for Prequalification in Bidding No.   371

for SUPPLY of air hoists for Arctic LNG 2 plant

Client

Arctic LNG 2

Bidder


1                     General information.

 

Company   name


Address  


City   and postcode (zip code)


Country  


Telephone  


Fax


Email


General   Director, full name 


Date and place of registration   and registration authority


Form   of incorporation


Charter   capital


Headcount   (as of the date of Questionnaire submission)


Information   about any petitions in bankruptcy and bankruptcy cases or liquidation   proceedings (in the 2 calendar years prior to the date when this   Questionnaire has been filled in)


Contact   persons: position, phone number, email address (at least 2 contacts)


 


2                     qualification and technical parameters

No.

Parameter

Allowed / not allowed to take part in the second   round of bidding

Supporting documents

Information from the Bidder (the Bidder should make   references to those clauses (paragraphs) of his Bid which contain the   relevant information)

1

Compliance   with the codes and standards of TR CU 010/2011; TR CU 012/2011

Allowed/Not allowed

Certificates   of conformity with TR CU


2

Development of equipment datasheets

Allowed/Not allowed

Datasheet   for an air hoist (in Russian)


3

Development   of equipment operating and maintenance manual

Allowed/Not allowed

Air   hoist operating and maintenance manual (in Russian).


4

Rated-load   climatic testing of air hoists at a temperature of -40ºС (U-1 climatic category).

Allowed/Not allowed

Test   protocol.

Photos   and video footage of: the testing (of finished goods).


5

Confirmation of the operating temperature ranging   from -40ºС to +40ºС (U-1 climatic   category).

Allowed / not allowed

Certificates of conformity.


6

Confirmation of the storage temperature ranging from  

-52ºС to +40ºС

Allowed / not allowed

Test certificates, protocols.


7

Confirmation of the possibility of installing the   hoist in AREA 1 - IIA - Technical Assignment

Allowed / not allowed

Certificates, declarations of   conformity.


8

Acceptance testing for static (125%) and dynamic   load (110%)

Allowed / not allowed

Test protocol.

Photos and video footage of: the testing (of   finished goods).


9

Use of air for operation according to GOST R ISO   8573-1-2016 class 1, pressure of 7.5–8 bar

Allowed / not allowed

Datasheet for an air hoist


10

Confirmation of the possibility of manufacturing the   hoists whose height of lift will match the design values (normal or reduced   overhead clearance).

Allowed / not allowed

Datasheet for an air hoist


11

Whether the hoists are fitted out with overload   limiters and hook height limiters.

Allowed / not allowed

Datasheet for an air hoist


12

Availability of lift and shift brakes

Allowed / not allowed

Datasheet for an   air hoist


 

 

COMPANY (______________ insert name) hereby acknowledges and agrees that:

 

a. It will bear all costs and expenses associated with submission of the Questionnaire for the purpose of prequalification;

b. The materials that accompany the Questionnaire for the purpose of Prequalification will not be returned after review;

c. The Tender Committee is not obliged to furnish any Applicant with a rationale behind the resolution that follows Prequalification;

d. The Applicant that fails to make it past the Prequalification may not claim compensation for any expenses or losses nor file any claim pursuant to Articles 448 and 1058 of the Civil Code of Russia, regardless of the rationale and date of the Company's resolution to disallow the participation of that Applicant.

 

 

 

Position of the authorized officer ________________ full name