Hybrid capacity bridge crane
Overhead traveling cranes or bridge cranes are also known as hanging cranes, usually on both ends of the supporting rail of the high level wheel rail. Usually, in order to make the whole crane move, it is usually installed on the parallel sidewalls of factories or similar large industrial buildings. The hoist can move across the building to and fro.
 A good solution is to use hybrid capacity bridge cranes, which can make use of their system capabilities to reduce the weight of bridges. This helps to make use of system capabilities to provide multiple upgrading solutions within a coverage area, using heavier capacity runways with multiple smaller capacity bridges.

Overhead traveling cranes( bridge cranes).jpg

In order to expand the coverage area, a bridge with mixed capacity can be used on the same track, and the maximum productivity is provided by a complete system. Hybrid capacity bridge crane systems can still use multiple bridges on the system without bridging or bridging buffers. The single rated load is the decisive factor of the bridge size, and the combined weight of all loads is the decisive factor of the size of the runway. For example, two 1000 - pound bridges or 4500 - pound bridges can run on a 2000 - pound runway at the same time, because the lever system can not only provide greater flexibility, but also reduce the weight of the bridge. Secondly, the hybrid capacity bridge is lighter than the single bridge system. The workers can use multiple side by side bridges to transport the load without overloading the system, Which Makes hybrid capacity bridge crane extremely ergonomic and easy to move.
 But the most important thing to note is that if the capacity of the bridge can not exceed the capacity of the runway, there is no need to add buffer components. The capacity of the runway is a live load that can be raised by the system. The crane weight of the workstation crane is fifteen percent of the weight of the crane and trolley. This means that if you buy a 1000 pound bridge, it will subsidize 150 pounds to make up for the weight of cranes and trolleys. If hybrid capacity bridge crane overloads and will cause serious damage to your system and workers, and even cause death. If there are other operas on the overhead crane, please contact the overhead crane manufacturer or engineer.
 If you use multiple hybrid bridges in the facility and a runway in your consideration, you should make some basic preparation. First, you can decide the length of the runway at will. This figure has no fixed range, so long as it can cover the length of the whole facility. However, the bridge length is kept at a minimum value, preferably because of ergonomic design.
 For operators, the heavier the weight, the better. Therefore, "less is more" is the principle of bridge crane operation. For the circular area, the shorter bridge length is better than the longer bridge  length. What does the long bridge usually do? It is mainly used to maintain a lower production cycle. The low capacity system that improves productivity is  also recommended by most engineers. So you need to think more about the capacity of overhead crane you purchase, because when you buy too many "capacity", you may reduce the efficiency, and you have to move the extra bridge "self weight".
 Here's another option: the bridge buffer and the intermediate end stop. It is based on the needs of your operation and facilities to consider the equipment, if you do not want to use a runway to deal with a number of mixed capacity bridges.
 If you are worried about runway overload, you can use the conventional hybrid capacity bridge crane system to build the hybrid bridge head and then run the entire runway length. However, in order to support all bridges to be completed under one load condition, a large enough runway must be purchased. This is a big test for cost. If you think it's too expensive, you can use the bridge buffer system to ensure that the system is used correctly,  which will cost less than the hybrid capacity system.
 It works by using a bridge buffer system. A single rated cutting can determine the size of a bridge, and the size of the individual load determines the size of the runway. These regulations determine that the same track series must be the main bridge for the runway. Not all bridges can determine the capacity of the runway, because the system has different mixing capacities. Sometimes the weight of the bridge can determine your runway. In order to provide greater flexibility and productivity for the entire facility, you can install a runway system, but the weight of the runway does not need to be too large. On the contrary, you can choose the heaviest bridge to cushion the bridge through the movement of the bridge.
 In order to achieve the minimum distance of operation, the bridge buffer should be suspended on the two trolleys on the runway. In essence, the most essential reason for the bridge buffers to be designed in the track between the bridges is that they can be separated through the rolling of the buffer, so that the capacity of the runway is not overloaded. With the advent of bridge buffers, workers can make the system more accurate and ensure that the two bridges are not in contact with each other under the condition of insufficient load. Although bridge buffers can be regarded as perfect planning for maintaining low cost and improving system flexibility, they do have a drawback. That is, when the buffer starts to work, it will use the space to create a moving "dead" area between the bridges, which will limit the coverage. So you should decide whether to use the hybrid capacity bridge crane system or the bridge buffer system according to your company's operational capability and equipment needs.
 It is the same as the bridge buffer, but the design is slightly  different. The facilities are intermediate ends. It separates the brakes and  buffers of the bridge from the inside. The middle end stopper can use a smaller runway to make them highly cost-effective, which is the difference between the conventional hybrid capacity bridge crane system, such as the bridge buffer,  and so on. Its disadvantage is that it will produce more "death"  points in the system. But in each operation, additional support is needed to eliminate the potential overload of the system, which limits the running of each bridge on the runway. Installing the middle end stop at intervals can prevent the machine from running more than one bridge on some parts of the runway. So when each bridge is isolated into a single span, it can minimize track capacitance.
 In this reminder, after you have carefully considered the design of the system, you can consider whether to improve the flexibility productivity of your system, which is particularly important for you. The conventional mixing capacity of the bridge crane system, the buffer zone in the middle of the bridge is within your consideration, all of which depends on the overall needs of your equipment and operation. The appropriate bridge crane system can greatly improve the production efficiency and safety of any environment, but if you want to customize the equipment that belongs to your own factory, we will always meet your requirements and try our best to make you successful.
 Because of the ability to lift weights and move them from one place to another, a crane is a huge source of relief in major industrial operations. It is the most important necessary condition in almost all other heavy industries, which leads to a great increase in the demand for the bridge crane  over a long period of time. If you have a factory that needs a certain degree of promotion, if you don't have a crane, then your employees have to move things from one place to another, which is too difficult for them and is not  too expected to use human resources. Otherwise, it might lead to a worker strike. The emergence of cranes perfectly solves this problem. Because of its extremely strong and reliable characteristics, pressing the button can lift heavy objects very well.
 Excessive lifting weights can cause serious injuries to the back, arms, and legs, resulting in unnecessary tension in the muscles, which slows down the process of completing other tasks. Long term work will pose a serious threat to workers. From the humanitarian point of view, employers who have hurt workers failed, and from an economic point of view, a lot of labor costs will make you fail faster. So in the case of technology, you should use the help of technology, bridge cranes or electric hoist cranes can solve your troubles, and reduce the pressure of workers and increase their safety.